Select a standard program (e.g., "Highlights") and press .
Once physically installed, perform these checks before first use:
If the display shows an error code (e.g., relating to fan speed or sensor faults), turn off the main power breaker for 60 seconds to reset the internal PCB. wella climazon millenium manual install
Installing the (often referred to as the Climazon 2) requires precision, as these units are heavy-duty infrared hair processors designed for either mobile or wall-mounted professional salon use. Installation Configurations
Insert the articulated arm into the wall bracket pivot pin and secure the safety retention ring. Select a standard program (e
Use a soft, damp cloth with mild detergent; never use flammable substances like gasoline or lacquer thinner.
Determine the ideal mounting height. The pivot joint should sit approximately 180 cm to 190 cm above the finished floor. The pivot joint should sit approximately 180 cm
Use the provided cord management tools to ensure the power cord does not become a tripping hazard. B. Wall Mount Installation (Space-saving)
Align the wall plate, insert the bolts, and tighten them down flush against the wall. Double-check for any play or movement. Step 3: Mount the Articulated Acrobatic Arm
: For mounting directly onto salon furniture structures. Standard Specifications for Install Power Supply : Requires a standard 220V–240V outlet.